User Tools

Site Tools


start:scheduling

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

start:scheduling [2017/04/14 21:02] (current)
rnadler created
Line 1: Line 1:
 +==== Scheduling ====
 +
 +Creating a scheduling project: After creating a new project, select the Scheduling option from the project type dropdown list. While not required, the scheduling option manages the view shared users will have of the project.
 +
 +
 +Creating a task list: From the Admin menu, select the manage tasks option and enter the tasks that will be scheduled.  For example, a class or an audit follow up visit. Each task can be linked to a user type or panel field. Linking a task to a user type limits the scheduling of the task to a type of user.  When the scheduler is used only users of that type will be available for task scheduling  Linking a task to a panel field, allows the members of the panel field to be used for scheduling (rather than system users).
 +
 +
  
start/scheduling.txt ยท Last modified: 2017/04/14 21:02 by rnadler